OUR ADDRESS

Ukraine, Chernihiv region, Horodnia,

1st of May str., 53B

Shower mobile building for a modular rotational camp

PROJECT DETAILS

  • Customer: URD Ukrainian roads

  • Getting started: October 2021

  • Completion: February 2022

  • Area of ​​buildings: 60 sq. m.

Shower mobile building for a modular rotational camp

Project readiness

100%

Mobile showers are part of a modular rotational camp built for workers of the road company. Designed for simultaneous showering of 6 people.

The shower block-module has dimensions of 12x2.5 m and consists of 5 rooms: 2 equipped with shower cabins, 2 rooms with washbasins, 1 room with 300 litres boilers installed, two water tanks with a volume of 1000 litres each and a pump station. In each room of the modular building there are fans built into the wall.

In the shower rooms, drains are built into the floor to drain the water.

Sewerage and water supply is carried out through plumbing couplings built outside the building.

The electrical network is connected through the introductory power connector, a housing shield with automatic switches for consumer groups is installed.

Delivery to the installation site was carried out in assembled form by our own vehicles.

Project`s photos